Factory order control / Payment milestones

How our factory manages a custom order.

A documented path from a 40% project-start payment to production drawings, tooling, 100% inspection, packing approval and shipment release.

Wenzhou Oasis Metal Products FactorySeptember 22, 202614 minute guide
A 3D production model beside a finished custom metal coin
Structure is approved before tooling; finished goods are checked against the full controlled specification.
Direct answer

When agreed in writing, a suitable project can use a 40% / 30% / 30% staged payment structure. The first 40% starts the project. The second 30% follows production, 100% piece-by-piece inspection and buyer approval of agreed finished-product evidence. The final 30% is paid after packing, when the order is ready for shipment and before courier or forwarder pickup.

One controlled sequence

Every payment is attached to a visible project state.

The workflow has three buyer control gates: production approval, finished-product approval and shipment release.

01DefineScope, specification, quantity, delivery and written terms
40%StartEngineering, drawings, tooling and preparation
03ApproveControlled drawings and complete production specification
04ProduceTooling, sample when agreed and mass production
05Inspect100% piece-by-piece finished-goods inspection
30%ConfirmBuyer reviews photos, videos or inspection evidence
07PackQuantity, cartons, labels, dimensions and gross weight
30%ReleaseFinal payment before carrier pickup

Commercial control

First, define what the order and each payment actually include.

What the buyer should send

  • Product type and intended use
  • Front and reverse artwork or a clear reference
  • Finished dimensions and thickness
  • Quantity for each separate design
  • Relief, plating and color direction
  • Ribbon, clutch, keyring or other attachment
  • Individual packing and carton requirements
  • Delivery country, postcode and required arrival date

What the written order should state

  • Controlled product and artwork version
  • Material, process, tooling and sample scope
  • Unit price, quantity and separate charges
  • Plating, color, attachment and packing
  • Production and approval milestones
  • Inspection evidence or third-party inspection
  • Freight scope and delivery responsibility
  • Payment percentages and exact triggers

40% project-start payment

Engineering and production documents come before the mold.

After the agreed 40% payment, the factory team starts the project work listed in the quotation. This may include engineering review, production drawings, tooling preparation, materials, accessories and a physical sample when included.

A complete production approval can include:

  1. 3D production drawingFront, reverse, dimensions, thickness, 2D or 3D relief, outline, holes and structural relationships.
  2. Flat color artworkColor areas, boundaries, orientation and the approved artwork version.
  3. Plating and finish specificationNamed finish, reference standard or approved physical sample when applicable.
  4. Ribbon and attachment specificationDimensions, material, print artwork, hardware and assembly instruction.
  5. Packing instructionIndividual protection, presentation packing, labels and export-carton requirements.

Approval gate: required production documents must be approved in writing before the factory proceeds with the mold or the next controlled production stage. A verbal assumption does not replace the final approved file.

Tooling and production

Approved records move with the order through the factory.

Metal production equipment inside Wenzhou Oasis Metal Products Factory
Metal forming and related production are organized against the approved order specification.
Factory team checking and packing finished custom metal products
Finished products are checked before they enter individual packing and export cartons.
01ToolCreate and verify tooling after the production documents are approved.
02SampleMake a physical sample when the quotation requires one; record any known sample-to-production difference.
03AuthorizeThe buyer approves the sample or gives written authorization for mass production.
04ManufactureForm, trim, polish, plate, color, print, coat and assemble as required by the product.
05ControlUse first-piece and in-process checks to stop a repeated issue before more value is added.

Changes after drawing, tooling or sample approval may require revised documents, tooling adjustments, another sample, extra cost or a new schedule. The revised written version becomes the new control record.

100% inspection before packing

Every finished item is checked piece by piece.

“100% inspection” means every finished product receives a manual check before packing. The applicable criteria come from the approved drawing, artwork, process specification, attachment and packing instructions, physical sample where applicable, and agreed production tolerances.

01

Surface and plating

Finish direction, obvious scratches, stains, bubbles, missing coverage and visible defects.

02

Artwork and color

Correct design version, text, orientation, color areas and visible print or enamel condition.

03

Structure and assembly

Product form, applicable dimensions, moving or functional parts and attachment security.

04

Ribbon and accessories

Correct ribbon, color, print, cut, stitching, clutch, ring, magnet or other specified component.

05

Version and quantity

Correct front, reverse, variant, ordered quantity and allocation between separate designs.

06

Packing readiness

Only conforming pieces move to the approved individual-packing and carton stage.

A piece-by-piece check does not remove the need for an agreed acceptance standard. Plated metal, hand-applied color and textile ribbon can have normal production variation; acceptable tolerances should be defined before production when they are critical to use.

Second 30% payment

The buyer reviews finished-product evidence before packing is finalized.

After production and the factory's piece-by-piece inspection, the agreed review evidence can include batch views, front and reverse views, plating and color detail, relief, ribbon or attachment, and any project-specific checkpoint.

Factory evidenceFinished-product photos, video and any agreed inspection record
Buyer actionCompare the evidence with the approved production documents
Payment triggerWritten finished-product approval followed by the second 30%

Photos and video are useful for appearance and visible details, but they do not replace every dimensional measurement or specialist test. A larger or higher-risk order can include an independent pre-shipment inspection if its scope is agreed before the order begins.

Define third-party inspection before production.

  • Who selects and books the inspection company?
  • Who pays the inspection fee?
  • Will the inspection be sampled or piece by piece?
  • Which measurements, functions and packing points are checked?
  • How does the report affect the second payment and shipment date?
  • What happens if re-inspection is required?

Packing and final 30%

The final payment is tied to shipment readiness.

The factory completes

  • Individual packing and accessory organization
  • Final quantity reconciliation
  • Inner and export-carton packing
  • Carton marks or labels
  • Carton count, dimensions and gross weight
  • Recipient name, address and telephone check
  • Courier, air, sea or forwarder handoff plan
Final milestone30%

Packed and ready for shipment

The final 30% is paid after packing and shipment-data verification and before the courier or freight forwarder collects the goods.

About spare pieces

When the product and actual production count allow, the factory team commonly includes a small number of spare pieces to help with isolated transit damage, event distribution loss or an individual quality concern. Unless a quotation or order document states a specific quantity, spares are not a guaranteed percentage and do not replace normal quality control.

Shipment release

After final payment, the order is handed to the agreed carrier.

1ReleaseFinal payment is confirmed and the packed order is released.
2HandoffGoods go to the courier, freight forwarder or the buyer's nominated China warehouse.
3DocumentsApplicable tracking, commercial invoice, packing list or transport record is provided.
4FollowThe buyer tracks transport and completes the agreed import and receiving responsibilities.

Production completion and transit time are different. The full lead time can include approvals, tooling, sampling, production, inspection, packing, international transport, customs clearance and final delivery. DAP, DDP and other delivery responsibilities must match the written quotation.

Payment map

What each milestone means in practice.

Project statePaymentFactory outputBuyer confirmation
Order confirmed40%Written quotation or PI; engineering and production preparation beginsScope, price, schedule and payment triggers
Production documents3D drawing, flat artwork, process, attachment and packing specificationWritten approval for tooling or the next controlled stage
Tooling / sampleAs quotedTooling and physical sample when includedRevision list or mass-production approval
Production complete100% piece-by-piece inspectionWait for agreed evidence
Finished goods approved30%Photos, video or agreed inspection evidenceFinished-product approval
Packed and ready30%Quantity, cartons, dimensions, gross weight and shipment preparationShipment-release milestone
Payment completePaid in fullCarrier handoff and applicable transport documentsTrack, import and receive according to the agreed delivery term

Shared responsibility

Clear ownership prevents avoidable disputes.

StageFactory teamBuyer
InquiryIdentify missing technical and delivery informationProvide complete, truthful requirements and the real deadline
QuotationDefine commercial scope, exclusions and payment triggersVerify the supplier, payee and order content
DrawingsPrepare manufacturable controlled documentsReview carefully and approve one final version in writing
SampleMake the agreed configuration and disclose known differencesApprove or provide one controlled revision list
ProductionManufacture and run process checks against approved recordsAvoid unrecorded changes after production begins
InspectionCheck every piece and provide agreed evidenceReview evidence or arrange the agreed third-party inspection
PackingPack, reconcile quantity and record shipment dataConfirm recipient and special label requirements
ShipmentRelease after final payment and provide applicable documentsComplete agreed import, duty and receiving responsibilities

When something needs attention

Return to the approved records first.

If the buyer, factory or inspector identifies a concern, the review should compare the goods with the latest approved 3D drawing, flat artwork, color and plating specification, attachments, packing instruction, physical sample where applicable, and written quality requirement.

1Identify the affected requirement and quantity
2Compare evidence with the approved control record
3Separate a manufacturing issue from a buyer-requested change
4Agree on rework, replacement, remake or another proportionate remedy

The factory may pause the next stage if drawings remain unapproved, an artwork change affects tooling, packing or recipient data is incomplete, a due payment has not arrived, an inspection result needs resolution, or changed bank details have not been independently verified. A pause prevents an unresolved issue from moving into tooling, mass production or shipment.

Frequently asked questions

Direct answers before a custom order begins.

Does every order use 40% / 30% / 30% terms?

No. This structure is available when both parties confirm it in writing. Order value, tooling exposure, complexity, sampling and payment method may change the final terms. The formal quotation or proforma invoice controls.

Does the mold start immediately after the first 40%?

The payment starts the agreed project work. Required engineering and production documents must still be approved before the mold is made against the final controlled version.

When is the second 30% paid?

After production and the factory's 100% piece-by-piece inspection, when the buyer has reviewed and approved the agreed finished-product photos, video or inspection evidence.

When is the final 30% paid?

After packing and shipment-data verification, when the order is ready for shipment and before courier or forwarder pickup.

Can the buyer arrange third-party inspection?

Yes. The company, fee, timing, scope, sampling standard and effect on payment and shipment should be written into the order plan before production.

What exactly does 100% inspection mean?

Every finished item receives a manual check before packing for the applicable plating, color, artwork, visible workmanship, assembly, accessories and ribbon stitching requirements.

Are spare pieces guaranteed?

No fixed percentage is guaranteed unless the order document says so. A small number may be included when the product and actual production count allow.

What happens after final payment?

The packed order is released to the agreed courier, forwarder or nominated China warehouse, and applicable tracking or shipping documents are provided.

Build a reviewable order

Send the artwork, size, quantity, attachments, packing, destination and required arrival date.

The factory team will place the product specification, approval stages, payment triggers and delivery scope into one written quotation.

Request a project review